Certification: | ISO,BV,CE | Application: | Sanitory,Food Industry |
---|---|---|---|
Steel Grade: | 300 Series,200 Series,400 Series | Standard: | ASTM,JIS,AISI,DIN,EN |
Welding Line Type: | Round Square | Product Name: | Sanitory Grade Welded Pipe Tp304 |
Type: | Welded, Liquefied Petroleum Gas, Round Pipe / Tube, Welded | ||
High Light: | SCH 10 Stainless Steel Welded Tube,Polished sch 10 ss pipe,Dn200 sch 10 ss pipe |
Polished Decorative Tube 201 304 Dn200 DN300 Schedule 10 40s Stainless Steel Pipe
* Certification: ISO 9001-2008 |
* Grade 201/304/316 customized |
* Package: Each piece in a plastic bag, then in bundle |
* Delivery time: Usually 15-25 days after receiving deposite |
* Thickness: 0.3mm-3.0mm |
* Diameter: 9.6mm-219mm |
* Supply amount: 1000 Tons per month |
* Material: Authentic material according to clients needs |
* Inspection: We can ensure 100% of our products qualified |
* Surface treatment: PPS/SSS customized |
* Payment: TT,LC,D/P,30% deposite and the balance before shipping |
Company Advantages
* Start to manufacturre door handles since 1997, being pioneer in the innovation of technology, we are always in the first place |
* 18 years exporting services experience, we can ensure everything goes well |
* Advanced pipe making machine & exported testing machine |
* Factory price but with excellent quality |
* Offer OEM/ODM service |
Pipe Advantages
Nitrogen treatment for welding joints,shall not have inter-granular corrosion inclination |
None-porosity, free of crack |
High glossiness of the tube surface |
International material |
What is the whole process for doing business with us ?
1) Please provide details products information you need.
2) If price acceptable and sample needed, sample can be customized via customers' requirement and be sent immediately.
3) If sample approved and bulk production required for order,proforma Invoice will be sent and products fabricating will be arranged at once when 30% deposit received.
4) Products photos, packing details, and will be sent to customers after products finished. Shipment will be arranged after the balance payment paid.
packing: with bundles, seaworthy packing for sea transportation ( big order in bulk; small order packed by strips or as the customers' requirement); wooden pallet or iron pallet is prerequisite for stainless products;
In terms of stainless products, we will use wooden pallet or iron pallet which has the polyethylene partition to isolate products which could protect the moisture.
delivery: 7-15days after receiving unfront payment